CHAUSSÉE DE JETTE 388 KOEKELBERG
---------------
CALENDAR DOWNSTAIRS COMMON SPACE
https://pad.constantvzw.org/p/chausseedejette388calendar
---------------------
KEYHOLDERS PAD
https://pad.constantvzw.org/p/chausseedejette388keyholders
--------------------- 
CONTACTS PAD
https://pad.constantvzw.org/p/chausseedejette388contacts
---------------------
CDJ MANUAL
https://pad.constantvzw.org/p/chausseedejette388manual
---------------
OLD TO DO PAD https://pad.constantvzw.org/p/studios

 
STUDIO  M E E T I N G S BELOW :

meeting 21 june Max, Annee, Rachel; Femke, Marius, Peter, Adele, (Diego)

tour de table/name reminder/welcome Adele with cake

Max, Annee, Rachel, Femke, Marius, Peter, Adele
There are also  Diego, Anne Sophie, Alexander (and Waldo), Alix, Constant


We gather in front - broken garden chair, toiler etc.
Marius can go Thank you Marius !

rachel : 2 contractors visited, combining with work next door
could be that the works will be done after the holiday.




Discussing how to involve Constant a bit more. How to share upkeep of the space, cleaning?
How do we speak about this space, to not default to it as Constant studio? Insist on Figs and Pears. Make a doorsign! Adele makes a temporary sign, and then Annee to paint one later.

Use of space: for anyone -- if you host a larger meeting, afterward clean floor, kitchen. Colleagues
Introduce how the space works.
--> Femke sends a gentle reminder

Max is onto buying more charcoal
-> it is going to happen ! probably in 2 weeks

adele.gregoire@protonmail.com


Max remembers the phdarts visit there was only Michael for Constant. Noone could really explain that there are other people here too. They were a bit rude to other users. Nobody introduced how the space works, create awareness there are other users/renters too at Figs and Pears.

clash titipi retreat and websprint to be solved
BMS will try to put things on the agenda (usually Fridays)

Max and Annee want to do some fermenting in the kitchen, would like to put a shelve. Offering tastings also, at Fix and Pear days. They promise to take care of any new lifeforms too. 
We say yes!

We'll move Max' stuff off the hatch Wednesday at 09:00 (Max, Annee, Femke)


CDJ meeting 20 May 17:30

Joining: Max, Marius, Rachel, Peter, Alexander, Annee (?)
Not joining: Diego, Constant, Alix, Femke, ...


A G E N D A :
    

Alex: good, some visitors, calm, some were asking questions
artists, makers ... 
12 + 20 persons
happy that it was quiet so could work
if we want more visitors, we should organise ourselves

Nextdoor 200 people on saturday for the party
sunday 30 ... 50 ... 







https://pad.constantvzw.org/p/chausseedejette388calendar



CDJ Meeting: Wednesday 15 april 17:00
agenda :
- confusion fix+repair poll
plan a new fix+repair

- Leo and Al are getting REPLACED
adèle +bms
isis +sewing + textile 
invite them for lunch fix + pears

- discuss: [FigsandPears] Fwd: Proposition de collaboration : Atelier in Beeld à Bruxelles
-Alex replies that we are not interested.

Fix and Repair day is setup on the 25 of april, one week before the Open doors. 

Adele and isis are welcomed in the atelier and invited to participate to fix and repair to get to know the place 

We can have test poster of Titipi ft. Alix
- Peter's chairs
- Peter Tesla burning Coloring books
- reading room in Rachels and Annees with specific hours.
- Rachel's octopus tests
- Alex something but does not know what yet, maybe activated maybe a demo of the cardeuse
- Constant? Alix asks

Peter makes a plannetje

Saturday 2 May 11-18
- morning: Peter + Annee
- afternoon: Rachel + Femke

Sunday 3 May 11-18
- morning: Femke + xxx ?
- afternoon: Alexander + Peter

Reminder: 5 euros in The Pot

report for caretaker :
- we missed one week of trash 
ehm ... 

coffee : Marius investigates the price of Santos versus Grain d'or and acts accordingly

Use of downstairs space :
past + upcoming DONE



Alix asks Max can buy a pitcher with a lid and the charcoal

Alix can be caretaker for the next month.

VGC subsidy : can Rachel take this on as a contracted person
As this does not move ... (Femke looking embarrassed)
we could pass this to Rachel as a contract, she would then do the job
Rachel would invoice Constant

.....


meeting 17 march
Agenda:


new cups bought
where are the brooms ? or buy new ones.
wooden spoons bought ...

Next month caretaker: Max





NOTES

Fridge
Super nice fridge. Max and Peter loved the shopping trip. It was tight, meant some scratches (invisible for now). Activate warranty!
Change direction of door? Maybe not because of wall on left. We can change it if it bothers ppl 

Fix and repair
Small group, nice day though. We try a datepicker for next

Other additions to the kitchen
Water filter:

How did the use of the space go
No rider yet, a section of the manual?
Caretaker report

Agenda check

VGC renovation
Back shed/extension? 
to do
____
Activate warranty for the fridge who ? 
With Dona, Peter
Make a poll fix and repair (somewhere until mid April) : Elodie
Max puts schedule for charcoal boiling in kitchen + little manual
Look for glass containers that close (for in the fridge) (ALL)
Alex gives https://pad.constantvzw.org/p/chausseedejette388 a check
Big things groceries by car -> Max, Peter 
+ Buy brooms -> Diego
Sign up for presence 2+3 may. (april cdj meeting)
Femke + Max arrange door opener with electricien + see about door

Next meeting: 15 April (its holidays) at 17h
Rachel will do a message to the signal


Next FIx + REPAIR Saturday 7 March
(
garden: prune fig
general cleaning
flush-box toilet upstars !
)

CDJ meeting Tuesday 17 february 16:30
Kitchen & Common space cleanliness (or the lack thereof🥲)
 alex: kitchen was dirty
 and it was left dirty afterwards as well (monday was impossible)
 but tuesday was hyper clean
 the party was great
 Alex hid the 'POT' just in case 
We can hide the money pot in the cabinet of the upstairs kitchen if there are events
 so we know where to find it if it is not on the kitchen
** Rachel baked an amazing cake once again: Blood organge **

Max has a space and is not moving, but his stuff will !

PW will get some more cups from circularium: 
    Styling prefence in the room is with prints of suspicious royalty ! Any country is good

New fridge please?
We agree to buy a new fridge.
IHPO-  is a good place https://ihpo.be/nl/koelkasten
Attention points:
- no mindreading computer on the fridge -no smartfridge
- tall one, lots of space !
- new one please, no second hand
- watch the maximum width !
- let's aim for 650 maximum (unanimous)
- do they take away the old fridge ? 
- Max + Peter will go to the store next friday afternoon.
- No dubble handle system; Check the handle system. We want one that opens to the left

Water filter ?
Install a waterfilter under the sink
they cost about a 100
but refill is expensive
- charcoal filters
Annee will have a look for it!

Under sinck rapid flow filter

https://www.aquasanaeurope.com/aquasana-claryum-aq-mf-1-direct-under-sink-water-filter/
https://www.waterfilterwinkel.com/3m-tm-waterfilterset-waterfilter-ap2-c405-sg-filterkop-vb2-jg-3map2set2

Meeting @Max for atelier in beeld
https://www.atelierinbeeld.be/nl/kunstenaar/figs-pears-euphorbias
1 2 and 3 of May 2026 which dates do you want to open ?
-> We discussed this last time and decided for 2 + 3 May we find a way to alternate presence.
For the poster:
Osp ok to do the design again, Sarah does the drawing again
-> great !
Send the information before 15th to Sarah 
-> Affiches terminées et imprimées le 1st of april

Construction (electric door and toilet)
update ????
-> nothing to update so far ...
Max will ask a friend who could do it ! Thank you

Check with caretaker for Januari how did it go ? new person ? 
Max was the caretaker for Januari 
it was nice to do

M. Cleaned out the fridge twice - gets dirty quickly

Tea situation: 
- Rachel could bring tea from the states ! We love it :-)
- Anne Sofie is not working at Café d'or anymore so nomore supply chain from there

Diego sharpened the knives which is great !

M. Observation: When constant organises an event, please put the date on it + message "please eat me" otherwise it takes up to muach space and stays too long. :-)

Orange trash bags: when you put them outside, best to leave them on the right

Max is volunteering to also be caretaker until the next meeting. 
Enthusastically unanimously agreed ! yeay

Date for fix + repair
7th march: Pruning Fig tree + gardening + basic cleaning + inauguration of the fridge

Insurance
Ask Donatella to check in what way CDJ is insured
for next meeting


Thursday 15 January 16:00
- happy new year !
- Atelier in Beeld on 2-3/05/2026? y/n + registration
Peter & Dona & Alexander say yes! :)
we will register for the two days.
Sarah & Marius were at vgc meeting, 

VGC would like to do their own open atelier' on another weekend to be decided in the next meeting: 25-26/04 or 09-10/05
Vgc would like that we do the communication like last year. Same budget.

Next meeting : We spreken af op woensdag 28/01 om 16u30 bij MAX.  Ik stuur nog wel een herinnering met de andere plekken.

We basically paricipate to both? Let's ask in the Signal.

###################################
 Verslag: overleg.01 – Atelier in Beeld 2026 - vrijdag 11/12/2026
Wie was er: Level Five: Laila; Globe Aroma: Alice Ciresola; MAX: Niels Poiz en Wessel Damen; Constant: Sarah Illouz en Marius Escande; VGC: Els De Greef

Intro
Er kwam een positieve reactie op de vraag van VGC om opnieuw mee te doen met de volgende editie van Atelier in Beeld/Open Studio Days. In 2024 was het de eerste keer met een eerder magere opkomst. Vorig jaar zijn we vroeger opgestart en gezamenlijke initiatieven genomen waardoor het geheel zeker sterker was. Er waren duidelijk meerdere bezoekers dan het jaar ervoor. We hebben de intentie om op dit élan verder te doen. De kaart, het samenwerken werd als positief ervaren door iedereen. Het is ook fijn om elkaar via dit initiatief nog beter te leren kennen. 
Andere locaties worden ook nog gevraagd of ze hun deuren openzetten, met al dan niet een programma.
= Werkplaats Walter, Sarah & Charles, Decoratelier, Moussem, Volta, MONA, …

De datum
Het weekend van Atelier in Beeld is 2,3 mei 2026.
Er is de ongerustheid dat er veel kunstenaars niet aanwezig kunnen zijn wegens het lange weekend (met 1 mei erbij). De suggestie komt om ev. een weekend later of vroeger te doen. De aanwezigen kunnen zich wel vinden in een ander weekend. Het voordeel is dat er meer kunstenaars aanwezig kunnen zijn om het atelier open te stellen. Ook is het lange weekend niet goed wegens veel volk dat mogelijk ‘op weekend’ is. 
Het nadeel is wel dat we dan niet onder grote weekend van Atelier in Beeld en zo niet meeprofiteren van hun promo. Maar hebben we dit nodig? Kunnen we dit ook alleen dragen? Er is een vermoeden van wel.
= Afspraak: VGC polst bij de niet-aanwezigen 

Communicatie
Er is het voorstel om terug een kaart te maken: fysisch en digitaal. Sarah (Constant) ziet het zitten om dit terug te doen.  De tekeningen mogen zeker door iemand anders gemaakt worden. Zo niet, zal Sarah opnieuw de tekeningen maken.
= Afspraak: Wessel denkt aan een kunstenaar binnen MAX. Volgende keer zal hij wat voorbeelden meebrengen

Programma
-route: We stippelen opnieuw een tour uit (stappen, fietsen)
-elke plek: iedereen zal overwegen om iets extra te voorzien – we houden rekening dat met elkaars momenten
-Eindigen op een plek is ook fijn om samen af te sluiten (cfr. Globe Aroma vorig jaar). Wel vraagt Alice (als het terug bij hen zou zijn) of er mensen kunnen meehelpen met de bar bv. om het voor iedereen draaglijk te houden.

Budget
VGC voorziet opnieuw 2000 euro voor het maken van de kaart.  (alles inbegrepen)


Volgende afspraak: woensdag 28/01 om 16u30 bij MAX
##########################################

- Any news about last works to do in the house ?
Peter: Contacted Renaud the electrician, by mail, by telephone, message .... no reply. 
Question: does anyone know a sympa electricien ? 

 Yes: Electromid 
 +32 493 93 54 73
 electromid@outlook.be

- Blue door : 
Outside glass backdoor of the frontbuilding: 
   Replace door
Install electric opener, with a big button on both sides (wheelchair accessbility)
1500 still left from Vgc 

- Toiletdoor

- Handle on the plastic white door, on the outside, 

we can maybe do the toilet door and the plastic door ourselves on a Fix and Repair. ?

CRH Châssis & Portes et Fenêtres
02 720 80 08

Belisol Ganshoren - Châssis, Portes et Fenêtres coulissantes
02 204 07 90

TO BUY
 Coffee blender ? :)
 https://www.bodum.com/be/fr/11160-01euro-3-bistro 26 euros 
 https://www.bodum.com/be/fr/11750-01euro-bistro 40 euros 



House meeting 15 December, 16:00

Pineapple upsidedown cake opens the meeting! Mmmmmmmmmmmmmmm thank you Rachel

- How do we ask money back from Constant ? 
1. We will put cash pot in the kitchen from 1/1/2026 onwards, 5 euros pp per month
2. If more/larger:
We need to agree in a meeting or on Signal
If yes, send ticket to donatella if it does not fit
3. How do we continue with the monthly janitor (Taking trash out, doing groceries,..)
tasklist " space caretaker" : 
- test and improve tasklist :-)
- trash out
- regular shoppings (from shopping list see below on line 322)
- check if doors are closed, heating is off, ....
- keep an eye on the spcae of the space. (cleaning, how's the pot doing, how's the fridge doing ...)
- sending email / signal reminders for meetings ... fix and repairs ... 

- New amount of rent/energy :
Donatella has sent an email to all of us. There might have been a small misunderstanding ... we were thinking to slowly lower the reserve of 12.000 that we have build up... but...

We decide to keep as is. Rachel will be caretaker for this process and will bring it up again in November 2026.
tion


- Agnes flexdesk :
yes welcome :-)
there is a desk, but it is not a unit
55,--
Rachel sends an email to Donatella to confirm

- Keyholders (to be completed): https://pad.constantvzw.org/p/chausseedejette388keyholders

We decide to from now on to send meeting minutes and important announcements to the mailinglist.
Still we suggest ppl to be on Signal, even muted
Keys are your own responsibility (cut new ones)

- Al/Leo/Alix situation

- Alice has left the shared desk 
- Al would like to take over their desk, but hasn't confirmed that she is coming, so there was a gap of 2 months of rent. They are arranging this between them.
- Alix/Leo are waiting for a definitive yes from Al, which should arrive any moment 

- New people?

There is no place free at the moment. Jesse on the waitinglist?

- Jubile: Jesse

House meeting 20 November, 16:00 17:00

- Printer ?

- Constant shelves marked ?
- To do ? discuss  Fix + Repair

- BMS entrance ?
- Changing person in the shared BMS tablegroup
Alix writes: 
"alice is moving out of the trio desk (too far frome her place) al is interested in taking alice's place, leo and i are favorable with this decision, it makes a lot of sense for us, and also its the opportunity to reinvest this space that is a bit messy these last month, sorry about this visual trouble, and hopefully be more present here !
lots of love,

Al is welcome to join ! we are all very enthusiastic about this; so Alix and Leo and Al would share 1 'unit' :-) and it means an extra key for Al = the BMS group

Rent as BMS? And the group has keys?
We like BMS using the space, good experiences so far. 
Should they come onto the Signal channel? Be able to sign up in the calendar (or this is through ppl contract holders)

BMS has 1 and 1/2 desk but there are more people, re:titipi proliferation
Agree: BMS on signal, mailinglist and expect to take part (fix and repair, monthly meetings)

In practice, it is not true that key = contract!!!!!

Principle: 
- among us we would like to know the people who have a key
- everyone with key is invited to join figs and pears signal (means: can know about meetings, FandR, calendar, can contact others)
- We make an internal list of who has a key -> Femke
- Femke asks/discusses with Dona about keys: keys only to ppl that have a relationship to the collective taking care of the space. What does this mean for insurance

Discussion: what if overflowing? but we can discuss!

- Fix ? Femke forgot ...


- BMS warming/charging table upstairs next Friday 28/11 with some action OK?
- Invitation to join TITiPI for a talk/installation by Romi Ron Morrisson on Friday 28 at 19.00
- Network plan update: will meet with P**x***s infiltrate to reflash routers next week, hopefully unlocking them


NEXT FIX AND REPAIR
Saturday 15 November, 11:00
Who is present, see: https://nuages.domainepublic.net/m/sc7bK/vote/

TO DO (list made last CDJ House meeting)


House meeting 20 October, 16:00
absent: Femke, Marius, Rachel, Annee, Alex, Alix, Alice, Max
present : Peter, Dona, Leo, Sarah, Diego

A g e n d a * * * 

HOUSEKEEPING
* Review Alex' house keeper period + who will take this on next ? 
Some months ago we had the idea of someone in shift to take on daily little tasks (buy coffee, put the garbage outside or remind people to do it, etc...) 
We don't know how it went for Alexander. How did it go Alex ? 

**Who wants to volunteers to be next Housekeeper ?**

......

(You can discuss tasks with Alexander and everyone)
Minimum is:
- trash out
- regular shoppings (from shopping list see below on line 322)
- check if doors are closed, heating is off, ....

Maintenance
-> Leo writes to a Proximus friend to see how to get rid of the Proximus login interface on the routers :-)
* How do we announce Fix + Repairs, it seems often the same people are present, how can we do this so that others/ everyone can join ?
->
To make a doodle could work better? Because dates are often chosen by the people at the meetings but then the dates work only for them.
There are very few things left. 

Days we will propose are: 9, 15, 16, 30 november
** PW makes a nuage and will send around

** Leo makes sign 'please close this door' to put on the door


For next fix&repair: 
-> Buy one automatic doorshutter, put it on the door between kitchen and staurcase, so it closes automatically.
**Does someone want to adopt this job ?
-> Take of the automatic doorshutter of the boiler room and put it on the street door, put a magnet (or smething similar) on the boiler room door.
**Does someone want to take on this job ?
-> in the meantime : put new message on the door: Please always close the door and do it gently! ;)
-> Frames for upstairs windows are ready and up, we just need to buy plastic and tagg it on the frames.
**Does someone want to take on this job ?
-> Light in front house corridor, and above the blue glass door, needs to be repaired
......
-> general round of cleaning: staircase, main space, kitchen, hallway, toilets, ....

News from Fix? -> 
**Dona check with Femke and Rachel and if no news, Dona call VGC to ask if we can call another company !

Constant's shelves and materials:
Repeating the protocol for lending material: 
* If you need to use Constant materials for 1 day or more, please ask Constant 
-> mail or sms Donatella

** Let's reserve some shelves for Constant and clearly mark them (CONSTANT)
** Constant labels the materials (CONSTANT)

Questions from BMS
* Printer in general space : where is the Brother laser printer in the general space ? Is it ok to use that ? 
**First we look on the shelves, (No, it is not there)
**Donatella looks in Constant office. And also asks the question to Constant if it is OK to keep using that the printer here in the collective space ?
** If Constant thinks it is better to not have the Brother in CDJ, then we buy one for the collective space (An epson inkjet with ink bottles would be good !)
Can we do this before the next meeting ?

* Some BMS subjects
BMS is less public then before. First there was a newsletter, and moments were public, and now it is more an inner circle communicating through the Signal group, but there are many people connected to it. They received some funding from Marius Jacob foundation, they want to open more to others, how can the BMS group live inside of CDJ ?
Lot of materials that needs to go up and down, not very practical.
Q: Can they use the small shed, the one closest to the buiding, as a tool shed ? 
A: Yes
Q: Would it be possible that more people with keys access the space to get material? For exemple 3 or 5 people.
A: Opinions are divided, some yes, some concerns for responsability / insurance when keys start floating. 
**Option to consider: everyone who has a key, signs a 'contract'/ becomes a 'renter' but on different conditions: Could this work ?

**Alternative: store stuff in the basement in the front house, so no-one needs to access the studio. Sarah will ask owner next week if basement belongs to 386, if so it needs to be discussed with the group.

**@ Alice: did you start a rider for using the space ?
(See Below, more or less on line 310)

Varia:



byebye !


M E E T I N G  25 S E P T E M B E R

Rent changes
- We have a surplus, but should not let it grow too much
- Stop putting money aside, keep what is there
Dona makes a proposal, we will do what she says:
- not add more to the reserve
- the easiest for Dona
- change from January

FIX?!?!?!?!
- no update ... Femke calls 5 times tomorrow 
if they don't do what femke says, we see if we can go elsewhere (inform about the process and ask VGC)

Fix and repair this Saturday 27th
We start at 11:00

- Whiteboard -- Alix brings it?
- Plan curtain: what about rail?
-- Rolers and another rail at IKEA: Marius saturday morning
-- Curtain sheer white silver or grey: Rachel
- Windows upstairs
-- check: are they secured (ladder, call Sabri, patte, )
-- make frames with plastic
--- get new plastic: order
--- get wood for frames, see what we have: Peter
--- Move ladder

- Lamps in hallway, check and replace ... Main hall way: reconnect electricity (the white frosted protection and hanger is at Peter's desk. 
; above the white door: replace the lightbulb; 
above the blue (glass door) check what is going on, it flickers

- Garden
-- Nettles
-- Pruning


To buy
- a second vacuumcleaner for the shed (one with the plug) PW= send type to Dona(Alix) Dona
- a cheap workmate (up to 150) (Alix)
- get some big cutters, a spade, a 'riek' for the garden

News from the boreholes
- who checks with Universoil: Sarah
- inventory of plants in the garden in the making: 
    https://www.sarahillouz.com/JardinConstant

Open Call Constant for the garden
- next year (2026)

Check agenda

For next meetings 20 October 16:00:
Rider for the space (Alice)
Meeting of December: new amounts for rent


House meeting: Tuesday 19 August 17:00
Annee, Alex, Alix, Max, Peter, Femke


Next Fix and repair 6 of september needs some people (Rachel, Max, Peter, Femke later, ...):
- Curtains
- Cleaning
Another one on 27th of September
- Windows upstairs before winter (mid-October). 
- Also care for the top window. Might need some work. Next fix and repair
- Cleaning

Shed
- looks great! well used.

Tournevie
- Max idea: shall we get a yearly subscription to Tournevie ? for 50 euros per year you can borrow a lot of different machines, mainly consturction tools: 
https://tournevie-bxl
We're excited. Let's do it!
Max inquires and sets it up.
Maybe another whiteboard?

Things to buy for the space
- a second vacuumcleaner for the shed (one with the plug) (Alix)
- a cheap workmate (up to 150) (Alix)

Garden
- what's up with the fig tree
- Alex has plans with leaves from the grass plant in the middle
- Universoil will come in September to cut a hole of 13m by hand in the corner of the terrace and in the back of the garden. They will let us know the results. Comissioned by the owner.
- get some big cutters, a spade, a 'riek' for the garden

Femke will contact FIX to replan

We do a cleaning round to deal with some deserted potatoes

!!! Alex is housemaster august-september

Alix sends a reminder about the meeting and save the date for the next




House meeting : Tuesday 15 July 16:00
-> Present: Peter, rachel, marius, Sarah, Max, Alix
-> Absent: Femke, imane, Alexander Annee, alice ann-sophie

* RENT - From last time:
We discussed lowering the rent and decided for a new amount (see notes of previous meeting) 
Question is now, when and how do we alter our (automatic) payments ?
-> on 16/06 Dona proposes per email to rediscuss in September.
-> what to spend the money on ? lets talk for the fall :-)

* Updates Fix work still to be done ? 
To be followed up ... 
For september: Donatella needs to find out if VGC agrees to evetually work with someone else if Fix can not do it in time

* Reports passed activities :
What has happened lately, how do we feel it is going, what can be improved ?

- Juries Saint Luc: 
    -spot on the panel (email Dona) -> Is ok, no drama :-)
    -cleaning (remark Femke: clean toilets) The general spaces, especially the floors tend to become quite dirty, and if groups / other then us use the space, cleaning after them is annoying. 
        
-> We will make a rider for the space when people use the general space .
with instructions what we expect them to do.
Leave the space like you find it.

?? Who would lilke to adopt the job of making the rider ?

* Storing Batteries
Decided with Leo for storing the batteries : 
    -> Get a metal cabinet ; anti flamable, and put it in the basement

* the Felt curtain needs to be cut, 
but we wait untill september because it will stretch out still
cut needs to be 2 cm above ground (1 on the hghest point)

Rachel proposes to add a thin curtain, that we can put behind the felt one, 
so that you can organise privacy, but it lets through light to the kitchen.
- Max is going to IKEA and will buy rails
-> Next Fix + Repair ? 

* Concerning the CCC with Steven: 
- there was a lot of stuff left on monday in the space when Sarah and Marius started building up, that is not the idea, space should be empty.
- And the other way around: Before the sunday performance the space was not empty, because there was a table with stuff of Marius and Sarah on it.

-> Let's try to stick to the rule that the space needs to be empty when you're done, so that the next people can start with an empty space and not with left overs.

* Sarah has added the third curtain, now the space can be dark (nice !)

* Some stuff has moved next door temporarily, 
Please make sure it comes back: ladder, small white foldable table, steps
-> is it ok that Rachel keeps the ladder for a few days ?

Upcoming:
Look at the upcoming events together
https://pad.constantvzw.org/p/chausseedejette388calendar

* what about work on the shed ? 
-> in progress !! have a look :-)

2 ideas come up: 
* make a list of collective things, such as: olive oil, garbage bags, dish wash soap etc. 
and put it on the fridge, (maybe on a white board): 
and then everyone can make note when we run out of it.
The person responsible for that month can then easily go and buy.

Start of the list : 

-> We decided that between the House meetings there is one (alternating) person  takes responsability for making sure that there is enough collective material in storage and kitchen.
* Untill August 19: Marius

* New dates

* TO DO
Please adopt one of these jobs: 

For agenda of AUgust meeting: 
    - Max idea: shall we get a yearly subscription to Tournevie ? for 50 euros per year you can borrow a lot of different machines, mainly consturction tools: 
    https://tournevie-bxl

For agenda of September meeting:
    - Donatella : adapted payments 
    - What to spend the money on (difference between what we have in reserve and what we want to keep)
    - Donatella : Find out if VGC agrees to eventually work with someone else if Fix can not do the works in time this year.
    

end fin einde


House meeting : 16 June, 15:00
    -> present: Ann-Sophie 🤠, Peter, Annee, Alexander
    -> absent: ..., Femke, alice, sarah & marius (problem of truck driver we will be there but probably too late, something like 16h),Max, leo 

- Overview of energy costs, proposal for potential new charges for the rent
(Donatella will inform us on Monday per email on the mailing list)


-> We propose that we lower the charges to cover the real energy costs. 
An attempt to calculate this :

* if the rent is 1700 (check)
** and the year energy costs for 2024 were : 12 x 107.22 = + 637.22 + 100 (we pay extra to the owner for electra)= 2024.16 per year/ 12 = 160 per month. 
** and we assume the energy consumption+ price stays the same in the future

then the total costs per month = 1860.00€ (rent + gas)
per unit (we have 16 units ? -check! ) = 116.27 

* Then we can lower the charges to 117.00 euros ? 
or something like that
(question to Donatella : can you please check with the real numbers :-) )

+ We keep the reserve at: 12.000 €
-> So we can spent from the current 16.000 until we reach the 12.000
Which allows covering the worst costs such as : a new heater
-> We need a meeting at this moment so we can reconsider to maybe rais the charges again. (the "12.000€ Meeting")

- Update last renovation works with Fix:
Rachel: Alireza should make a new appointment,
Question to Femke : Did you make an appointment ?
-> No appointment, last one was cancelled, Femke is waiting ...

Question to Donatella: 
What is the latest dat that we can give the invoice ? 
.... is it still ok if they do the works in September ? We won't get an invoice until the work is done, which would be October.
If that is too late, we have to maybe look for another. 

We have a fix and repair for hanging the curtain: 
Question to all: Can you add your availability please: 
    29 June: Peter + Rachel + Marius + Sarah + Diego +...

There are other things to do, but they have less priority: 
    + straighten the ramp 
    + look at the shed

- Update of the next door developments  (Sarah, Marius, Rachel,....
They have the keys !
- Writing the statutes for ASBL in preparation, it is being checked
Hope is to sign for July 1st, maybe it will be August
Space is full, there is a little left

If someone wants the attic , they want to rent it out cheaply
it is 100 square meters ... rent will be 400ish. a deal can be made, if someone wants to clean it up ... ?
can it be an exhibition space ? 

Agreed is that only people who are working in this space and use also a part of nextdoors. The people who only rent nextdoors do not get the key to the blue streetdoor.

Question to all: Is anyone interested in using the wood + metalwork studio that they will install ? -> contact Sarah / Marius

- Dates/ plans for shed improvement ? 
Let's discuss this on 29 June (Fix and Repair)

- Setting a date for next meeting
Next studio meeting on 15 July 16:00

Question to all: Can you write your name below if you can be present ? 
Alexander, Rachel, Peter, Marius 


- End👏👏👏

<3, <3,<3,<3,<3,<3,<3,<3<3,<3,<3,<3,<3,<3,<3,<3
<3, <3,<3,<3,<3,<3,<3,<3<3,<3,<3,<3,<3,<3,<3,<3


29 May : Clean up the shed: 
- peter, diego, alix, rachel, Femke
Helping with moving the wool + get rid of, move/reuse building leftovers

House meeting: 15 May, 15:00
- cake !
- next door news


Start a waiting list specifically for cdj388

Shed plans: Alix, Peter, Rachel, Diego, Leo, Max
This will happen by magic, not linked to fix + repair
- maybe add a roof, but not necessarily/maybe later
- Making another table
- a place to hang tools
- making a shared toolset (but mark them)
- two different sheds, how to divide them

Felt door update: felt successfully glued, will need some help for the rail (it is suuuuuper long). Rachel keeps us updated

Cake!

Agenda check


Weekend open studio plans

Ppl only can go upstairs when there's someone

Saturday

11:00-14:00 Diego, Max
14:00-18:00 Diego, Alex, Femke, Peter

Sunday
11:00-14:00 Diego, Femke, Peter
14:00-18:00 Diego, Alex, Femke (upstairs, working)

Next meeting: we'll know what we paid for gas, recalculation.


15 + 16 MAY = install day for open studio weekend

propositions for showing stuff during open Atelier in Beeld: 
    - Collective book/ publication table 
    (Common room, Titipi, Seasonal Neighbors, Constant, peter, Alice,  ...
    (if you have publications, books, please add them !)
    it is nice for visitors to see / read : look at documentations of what ppl do, and books / printed matter helps. 
    - Diego: Sound installation in garden (sounds from the compost)
    - Marius / Sarah: banners (hallway ?) and maybe one work ? 
    - Peter: thermo foto's, mobile hanging structure in middle of space
    - Femke: some Posters, cushions
    - Alexander ? ...


10 + 11 May : FIX AND REPAIR WEEKEND: 
Saturday May 10 (try to be there)
Sunday May 11 (if you can't make Saturday)

To Do : 
    - buy kitchen stuff (see list Leo on fridge)
    - install metal bar in hallway for fastening bicycles (NEXT TIME)
    - repair main light in the entry hallway near street (NEXT TIME)
    - reposition toiletroll holder toilet downstairs (NEXT TIME)
    - install shelves in toilet downstairs (NEXT TIME)
    - reposition pots and heavy plates to lower shelves / find storage for bags/ rolls etc. elsewhere
    - add small shelve above the herbs / near stove. 
    -cut and glue felt cutain
    -install door on hallway cabinet
    - kitchen cleaning: floor
    - clean windows
    - clean stairs, toilet floors
    - any prep for Open Studios needed? (we can do this after house meet on 15/05 ?)
    - ...


Meeting: 16 April 15:00
 
- re-invitation Gwen 24/4 16:00
https://titipi.org/wiki/index.php/EU_AI_Act

- question: do we want a dish washer ? (suggestion constant)
discussion: 
But: Is it really an issue? 
But: diswashers in collective spaces are nice
But: it could take a while to full
But: Maybe useless, but for big group things? And do we have space? Using less energy/water. 
But: only if it is full!
But: usefull but for five days a year, not yet?
if a group event is happening a lot, yes, but we are in between ... 
doing the dishes takes twenty minutes ... 
But: It is often faster to do by hand, as a social event at the end of the night
But: I do not BELIEVE in dishwashers. Not needed.
--> consensus: we don't need a dish washer

* make a list of big stuff that we need for cooking
and get it. 
Rachel has some. 
Leo will make a start with a list and some hunting.

* Next renovations
-- Placing a bigger, lower sink priority
find one,
next Fix and Repair, try fitting it
-- before 15th April moving the wool to the cave for summer
-- thinking about the architecture idea for the backyard
-- thinking about a system to hang the colored wool bags in the entrance ceiling
-- finish the separator/curtain between main and front space (August)

* Next door update
a group is trying to rent space next door, overlaps with this space but not the same. It seems there are almost enough ppl to make it work.
Tamina asks extra fees for taking over the contract (6000) seems a lot!
Need to do electricity ourselves
Caves included as well
30 people incl. 20 students in messy part
some parts smaller/dirty and then a first floor which is nice

should 388 rent a part nextdoor? Could be interesting?
we prefer not to raise the rent
we need to know (end of june) how much the heating was
8€ per m2 in average

For next meeting: try to make a proposal (1000 € per year would get us 10m2 for example)
... More news soon

- A next FIX and REPAIR :
Saturday May 10 (try to be there)
Sunday May 11 (if you can't make Saturday)

- Next House meeting: Thursday 15 May, 15:00 : 
The day is for setting up the collective expo downstairs:

- Agenda check :
https://pad.constantvzw.org/p/chausseedejette388calendar


Report meeting 19 February
Present: Donatella,Max, Annee, Peter, Femke, Gwen, Marius, Rachel, Sarah, Alice, Alexander, ...
 
Welcome Gwen ! who is in residency @ TITiPI until end of April
 
Agenda
Points to be discussed :
  1. Storage space
  2. collective printer ?
  3. Rent and renters
  4. Budget
  5. New date Fix + Repair
  6. Open call for Constant commission
  7. Atelier in beeld
  8. GASAP question
  9. Saint Luc jury question
  10. Constructions, afterlive and future
 
REPORT/
  1. Storage question: what are storage needs, what is stored in collective spaces etc.
 
DOWNSTAIRS
-> only for material for general use
ABOVE HEATER + BASEMENT
 
BACK GARDEN SPACE
The personal stuff needs to be removed from there. These are common spaces and people need to use them.
-> Personal stuff (wool) needs to be out before spring.
 
2. Collective printer ?
 
3. Rents and renters:
-> Make the desk in on the back room into a meeting table (not a flex desk)
 
4. Budget: 
5. New dates for cleaning / fixing (finishing cupboard) + House meeting (maybe we can set several dates for the year to come ? It used to be: 15th of the month with variable hours)
 
 
6. Constant is proposing to do an open call for an artistic project in the garden. What are our thoughts ? 
 
7. Atelier in Beeld 17 + 18 May
 
8. GASAP yes or no.
 
9. Saint-Luc jury in the common space
10. Construction afterlive -- curtains ....
10. Construction future (shed in the garden ? )
 
(cake arrives)
 
UPDATES
 
see you next time !
 
Meeting: 11 January 11:00 sharp
confirmed presence: Marius, Sarah, Peter, Femke, Rachel, Martino, Alexander, ...
 
GASAP ou non
Budget: works, reserve
Alexander would like to start sharing his desk space with Ann-Sophie
 
rest of day : work on shelves.
 
12 january
confirmed presence: Rachel, Marrino, Femke, Peter, Sarah, Marius
 
work on shelves