17/11
PLENUM MEETING
Marthe, Samyra, Pieter + Miljan online


Meetups
KITCHEN CHECK UP -  7DECEM morning 10.30 - Samya, Marthe, Miljan
MEDIA CAVE - 14/15 dec (sanding beams) - Marthe
MEDIA CAVE - 18 dec (late afternoon)
TOPFLOOR - measure topfloor, make plans (end of january)

To do list 

topfloor
windproof window (Miljan > isolation is in a blue box in the cellar) CO detector ? (koolstof-monoxide)
kitchenette
ventilation flap gaz - stoaf - investement ??- (franks: ask him the problem again - - - raf checks?) replace lamp fridge (samyra) hanging system - metal stick (pieter has 2m's of metal sticj...?)
Kitchen
- buy fridge.. extending.. deadline 
- using back room for cooling  
construct shelves*
Mediacave;
arrange tools ( sanding machines, dremel, ....) - ceiling lack / beits - wittisih 
-  hennep walls ( check with matthias > called but didn't pass by )
door flaps (buy screws +maps) DONE - colour surfaces
- colour hallway
- we don't invest in dryer _  for drying go to washing saloon /private room
- wood: move to the back? DONE hydraulic axe?

ground floor
bell system - parlophone ( manual) - perlofoonspecialist contacted- electricity finish 
- electrical scheme
doorhandel (samyra) isolation - varnish door ? do test black mdf  (any trace of glue on MDF will make dirty streaks ...)
frame window DONE tape door door brushes DONE- wooden stick on chimney

To Buy
More ledlamps
CO detector

* - re-cup °AIR (?) possible dates to check out left over furniture/ shelves/ materials, starting tomorrow (-: ...