Welcome to Etherpad!

This pad text is synchronized as you type, so that everyone viewing this page sees the same text. This allows you to collaborate seamlessly on documents!

Get involved with Etherpad at http://etherpad.org 17/11
PLENUM MEETING
Marthe, Samyra, Pieter + Miljan online


Meetups
KITCHEN CHECK UP -  7DECEM morning 10.30 - Samya, Marthe, Miljan
MEDIA CAVE - 14/15 dec (sanding beams) - Marthe
MEDIA CAVE - 18 dec (late afternoon)
TOPFLOOR - measure topfloor, make plans (end of january)

To do list 

topfloor
windproof window (Miljan > isolation is in a blue box in the cellar) CO detector ? (koolstof-monoxide)
kitchenette
ventilation flap gaz - stoaf - investement ??- (franks: ask him the problem again - - - raf checks?) replace lamp fridge (samyra) hanging system - metal stick (pieter has 2m's of metal sticj...?)
Kitchen
- buy fridge.. extending.. deadline 
- using back room for cooling  
construct shelves*
Mediacave;
arrange tools ( sanding machines, dremel, ....) - ceiling lack / beits - wittisih 
-  hennep walls ( check with matthias > called but didn't pass by )
door flaps (buy screws +maps) DONE - colour surfaces
- colour hallway
- we don't invest in dryer _  for drying go to washing saloon /private room
- wood: move to the back? DONE hydraulic axe?

ground floor
bell system - parlophone ( manual) - perlofoonspecialist contacted - electricity finish 
- electrical scheme
doorhandel (samyra) isolation - varnish door ? do test black mdf  (any trace of glue on MDF will make dirty streaks ...)
frame window DONE tape door door brushes DONE - wooden stick on chimney

To Buy
More ledlamps
CO detector
 
* - re-cup °AIR (?) possible dates to check out left over furniture/ shelves/ materials, starting tomorrow (-: ...